大跨度拱形钢网架滑移施工全过程仿真分析关键技术  被引量:10

Key Technology of Simulation Analysis in Whole Process of Large-span Arch Steel Space Truss Sliding Construction

在线阅读下载全文

作  者:张文学[1] ZHANG Wenxue(China Railway Construction Engineering Group Co.,Ltd.,Beijing 100160,China)

机构地区:[1]中铁建工集团有限公司,北京100160

出  处:《建筑施工》2020年第8期1541-1543,1546,共4页Building Construction

摘  要:根据厦门站大跨度拱形钢网架屋盖结构的受力特点和场地条件,采用地面分块拼装,高空分区分段拼装累积滑移的施工方案。从施工吊装、滑移、变形控制、卸载等方面叠合使用工况载荷进行了全过程的计算仿真分析,为此类钢结构的施工提供了借鉴。According to the stress characteristics and site conditions of the large-span arch steel space truss roof structure of Xiamen station,the construction scheme of ground block assembly and high-altitude subdivided and segmented assembly and accumulated sliding is adopted.From the aspects of construction hoisting,sliding,deformation control,unloading,etc.,the whole process of calculation and simulation analysis is carried out by using the superposition of the working loads,which provides a reference for the construction of this kind of steel structures.

关 键 词:大跨度网架 滑移施工 全过程仿真分析 变形控制 

分 类 号:TLM7[核科学技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象