检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:施颖东 SHI Yingdong(Shanghai Airport Construction Headquarters,Shanghai 201207,China)
出 处:《建筑施工》2020年第8期1579-1582,共4页Building Construction
摘 要:介绍了上海浦东国际机场的运行现状及T3航站楼的规划情况,阐述了目前行李系统存在的问题。通过建设、投资、使用、维修、维护等方面,分析了输送机、自动分拣机、DCV小车等运用在行李系统上的优缺点和各自的使用场景。最后,为T3航站楼行李系统的建设及运行分别给出了建议。This paper introduces the operation status of Shanghai Pudong International Airport and the planning of T3 terminal and expounds the problems existing in the baggage system at present.From the aspects of construction,investment,use,repair,maintenance,etc.,this paper also analyzes the advantages and disadvantages of conveyor,automatic sorting machine and DCV trolley used in the baggage system and their respective use scenarios.At last,suggestions are given for the construction and operation of the baggage system in Terminal T3.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249