检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈博 陆晶姗 杨云飞 陈悦 CHEN Bo;LU Jingshan;YANG Yunfei;CHEN Yue(State Gird Economic and Technological Research Institute,SMEPC,Shanghai 200122,China;Shanghai Heze Electric Power Engineering Design&Consulting Co.,Ltd.,Shanghai 200433,China)
机构地区:[1]国网上海市电力公司经济技术研究院,上海200122 [2]上海合泽电力工程设计咨询有限公司,上海200433
出 处:《电力与能源》2020年第4期476-479,共4页Power & Energy
摘 要:通过对正在运行的110kV地下变电站运维情况及实施的技改、大修项目的梳理,与典型变电站日常运维工作量进行了对比分析。总结出了地下变电站在全寿命周期内运维中的难点及与典型站对比需要增加的工作内容,并进行量化差异分析,编制相应的报告。Through sorting out the operation and maintenance of the 110kV underground substation in operation and the technical renovation and overhaul projects,a comparative analysis was made between the routine operation and maintenance workload of typical substation.This paper summarizes the difficulties in operation and maintenance of underground substation in the whole life cycle and the work contents that need to be added compared with typical stations,and makes quantitative difference analysis and prepares corresponding reports.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7