检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段恒冲 DUAN Heng chong(Inner Mongolia Railway Survey and Design Institute Co.Ltd,Hohhot 010000,China)
机构地区:[1]内蒙古铁道勘察设计院有限公司,呼和浩特010000
出 处:《工程建设与设计》2020年第19期52-54,共3页Construction & Design for Engineering
摘 要:现阶段,科学技术的发展十分迅速,并且城市化建设也加快了进程,所以,为了缓解交通压力,避免堵车等现象发生,城市交通线网的铺设范围就会逐渐扩大,并且下穿工程也开始慢慢增多。地铁盾构隧道在修建时,难免会造成各种邻近建(构)筑物的沉降以及变形,所以在进行地铁盾构隧道施工时,势必会影响运行以及使用。据此,针对盾构下穿铁路工程,必须要对下穿施工予以专项研究。At present, the development of science and technology is very rapid, and the process of urbanization is also accelerated. Therefore,in order to alleviate the traffic pressure and avoid traffic jams, the laying scope of urban traffic network is gradually expanded, and the undercrossing projects are also gradually increasing. During the construction of subway shield tunnel, it is inevitable to cause the settlement and deformation of various adjacent buildings. Therefore, when the subway shield tunnel is constructed, it is bound to affect the operation and use.Therefore, it is necessary to study the construction of shield tunneling under railway.
分 类 号:U455.43[建筑科学—桥梁与隧道工程] U449.52[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249