综采工作面回收煤柱过风桥技术研究与应用  

Research and Application of Recovery Coal Pillar Over-wind Bridge Technology in Fully-mechanized Mining Face

在线阅读下载全文

作  者:白二权 BAI Er-quan(Jincheng Anthracite Coal Mining Group Co., Ltd., Fenghuangshan Mountain Coal Mine,Jincheng 048007,China)

机构地区:[1]晋城无烟煤矿业集团有限责任公司凤凰山矿,山西晋城048007

出  处:《煤》2020年第9期16-19,共4页Coal

基  金:国家自然科学基金项目(51704154)。

摘  要:随着凤凰山矿开采年限的增加,煤炭储量日益减少,为提高煤炭资源回收率,减少煤炭丢失,凤凰山矿对盘区煤柱进行了回收。在总结传统过风桥技术的基础上,通过对凤凰山矿二水平煤柱回收综采工作面过风桥技术研究,提出了相应的解决措施和预防办法,保证了煤柱回收工作的正常回采,其研究结果为类似条件下的回采提供了借鉴。With the increase of the mining years of Fenghuangshan Coal Mine,coal reserves are decreasing.In order to improve the recovery rate of coal resources and reduce coal loss,Fenghuangshan Coal Mine has recovered the coal pillars in the area.On the basis of summarizing the traditional over-wind bridge technology,through the research on the technology of the recovery of the fully mechanized mining face over the wind bridge by the two horizontal coal pillars of Fenghuangshan Coal Mine,the corresponding solutions and prevention methods are proposed to ensure the normal recovery of coal pillar recovery work.The results of the study provide a reference for mining under similar conditions.

关 键 词:综采工作面 回收煤柱 过风桥 顶板支护 

分 类 号:TD355[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象