检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李炳炎 贾云飞 韩磊 Li Bing-yan;Jia Yun-fei;Han Lei(Iron-making Plant of Inner Mongolia Baotou Steel Union Co.,Ltd.,Baotou 014010,Inner Mongolia Autonomous Region,China)
机构地区:[1]内蒙古包钢钢联股份有限公司炼铁厂,内蒙古包头014010
出 处:《包钢科技》2020年第4期20-22,共3页Science & Technology of Baotou Steel
摘 要:文章对包钢3#高炉热风炉风温严重不足,热风炉凉炉更换格子砖工作进行了总结。凉炉前准备工作充分、凉炉设备安装顺利,工艺选择正确,整个凉炉过程历时38天,将1#热风炉由800℃降至50℃以下,凉炉较为成功。为今后包钢硅砖热风炉的凉炉提供了参考和理论依据。The blast temperature of hot blast stove of 3#blast furnace of Baotou Steel is seriously insufficient,so the checker brick needs be replaced when cooling hot blast stove.The job is summarized in this paper.The preparatory work before cooling hot blast stove is sufficient,installation of equipment for cooling hot blast stove is smooth and process selection is correct,the whole cooling process lasts for 38 days.As a result,it is successful since the temperature of 1#hot blast stove decreases from 800℃to below 50℃,which provides references and theoretical basis for cooling hot blast stove of silica brick of Baotou Steel in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.244.250