通过调整启动锅炉开启降低全厂天然气气耗  

Technical Discussion on Reducing the Natural Gas Consumption of the Whole Plant by adjusting the Start-Up Furnace

在线阅读下载全文

作  者:莫珺 Mo Jun

机构地区:[1]上海申能临港燃机发电有限公司,上海201306

出  处:《电力系统装备》2020年第16期160-162,共3页Electric Power System Equipment

摘  要:上海申能临港燃机发电有限公司作为调峰电厂,机组启停时间完全按照电网负荷需要调整,由于电厂启动锅炉需在机组停机前由备用切至运行,由此造成启动锅炉燃料的浪费。通过调整停机各辅助系统的投用时间,以此解决启动锅炉提前启动的问题。Shanghai Shenneng Lingang Gas Turbine is a peak-shaving power plant.The start and stop time of the unit is fully adjusted according to the grid load.Since the start of the boiler in our plant needs to be switched from standby to operation before the unit is shut down,this causes a waste of fuel for the starter..By adjusting the commissioning time of each auxiliary system during shutdown,the problem of early start of the starting furnace is solved.

关 键 词:启动炉 辅助蒸汽系统 汽机轴封系统 锅炉冷再系统 发电气耗 

分 类 号:TK437[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象