检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙小路 周春侠 张永志 代晓光 张鸿波 SUN Xiao-lu;ZHOU Chun-xia;ZHANG Yong-zhi;DAI Xiao-guang;ZHANG Hong-bo(School of Mining,Inner Mongolia University of Technology,Hohhot 010051,China;Department of Science and Technology,Inner Mongolia University of Technology,Hohhot 010051,China;Sihe Coal Preparation Plant,Shanxi Jincheng Anthracite Mining Group Co.Ltd.,Jincheng 048000,China;University Hospital,Inner Mongolia University of Technology,Hohhot 010051,China)
机构地区:[1]内蒙古工业大学矿业学院,内蒙古呼和浩特010051 [2]内蒙古工业大学科学技术处,内蒙古呼和浩特010051 [3]山西晋城无烟煤矿业集团有限责任公司寺河矿选煤厂,山西晋城048000 [4]内蒙古工业大学校医院,内蒙古呼和浩特010051
出 处:《内蒙古工业大学学报(自然科学版)》2020年第3期200-205,共6页Journal of Inner Mongolia University of Technology:Natural Science Edition
基 金:内蒙古工业大学科学研究项目(BS201914,BS201952,BS201902);内蒙古自治区高等学校科学研究项目(NJZY20083);内蒙古自治区科技计划项目(2019GG274)。
摘 要:本文结合选煤厂的安全生产管理过程中存在的问题与选煤流程作业的特点,介绍了选煤厂风险预控管理体系建立的基本流程,以及危险源辨识、风险评估与管理方法.为保证风险预控管理体系的高效运行,阐述了选煤厂风险预控管理信息系统开发所需的主要功能,根据功能需求设计了系统流程与基本框架.选煤厂风险预控管理信息系统的建立,为企业的安全管理提供了一个全面综合的WEB信息平台,有效的支撑了选煤厂风险预控管理体系的运行.Based on an analysis of the problems existing in the safety production management process in coal preparation plant and the characteristics of coal preparation process operations,this paper introduces the basic procedures for establishing the risk pre-control management system in a coal preparation plant,as well as the methods for hazard identification,risk assessment and management.In order to ensure the efficient operation of the risk pre-control management system,this paper also describes the main functions of the risk pre-control management information system to be developed for the coal preparation plant,and designs the system process and basic framework according to the functional requirements.The establishment of the risk pre-control management information system in the coal preparation plant provides a comprehensive information platform for corporate safety management,which effectively supports the operation of the risk pre-control management system in the coal preparation plant.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3