检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苏强 吴东明 SU Qiang;WU Dongming
机构地区:[1]柳州欧维姆机械股份有限公司,广西柳州545006
出 处:《城市道桥与防洪》2020年第9期194-196,M0020,共4页Urban Roads Bridges & Flood Control
摘 要:成品索式锚固体系已在悬索桥锚碇工程中得到越来越多的应用。针对有弯曲预应力线段的锚碇工程,分析弯曲线段对锚固体系的影响,创新设计和试验研究一种含分丝管结构的多股成品索式锚碇锚固体系。经试验与工程应用表明,该新型锚固体系解决了预应力锚索在隧道锚体中弯曲锚固和更换难题,适用于有弯曲预应力线段的锚碇工程。The finished cable anchoring system has been used more and more in the anchorage engineering of suspension bridge.Aiming at the anchorage projects of curved pre-stressed line section,the influence of curved line section on the anchoring system is analyzed.A multi-strand finished cable anchorage anchoring system consisting of sleeve structure is innovatively designed and experimentally studied.The experiment and engineering application show that this new type of anchoring system can solve the curved anchorage and replacement problems of the pre-stressed anchor cable in the tunnel anchor body,and is suitable for the anchorage engineering of curved pre-stressed line section.
分 类 号:U448.25[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.52.101