柔性垫层爆破工法在夹岩水利枢纽工程面板堆石坝趾板基础开挖中的应用  

Application of flexible cushion explosion in toe slab foundation excavation of concrete faced rock fill dam of Jiayan Hydro-complex Project

在线阅读下载全文

作  者:盘小平 刘芳 杨岁明 PAN Xiaoping;LIU Fang;YANG Suiming(SinoHydro Bureau12 Co.,Ltd.,Hangzhou 310004,China)

机构地区:[1]中国水利水电第十二局工程局有限公司,浙江杭州310004

出  处:《水利水电快报》2020年第9期30-32,共3页Express Water Resources & Hydropower Information

摘  要:夹岩水利枢纽工程地处贵州省喀斯特地区,地质条件相对较差,趾板基础开挖成形困难。工程采用了预留0.5 m保护层柔性垫层的爆破开挖工艺,保证了趾板基础成形质量。应用结果表明,大坝趾板建基面形体尺寸及平整度满足要求,施工方便,经济合理,且便于质量控制。夹岩工程实践可为不利地质条件下的趾板基础面开挖提供参考。Jiayan Hydro-complex Project is located in karst area of Guizhou Province with poor geological condi⁃tions,so the excavation and formation of toe slab foundation are difficult.The explosion excavation technology with flexible cushion layer of 0.5 m preserved was adopted to ensure the quality of toe slab foundation formation.The re⁃sults showed that the evenness and structure of the foundation meet the requirement and the technology is easy in construction,economical and reasonable,beneficial for the quality control.The practice can provide references for toe slab foundation excavation with similar geological conditions.

关 键 词:趾板基础开挖 柔性垫层爆破 面板堆石坝 夹岩水利枢纽工程 贵州省 

分 类 号:TV542[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象