检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁辉 刘劼 YUAN Hui;LIU Jie(Beijing Electric Power Economic and Technical Research Institute Co.,Ltd.,Beijing 100107,China)
机构地区:[1]北京电力经济技术研究院有限公司,北京100107
出 处:《价值工程》2020年第28期28-29,共2页Value Engineering
摘 要:暗挖电力隧道第三方监测费用在工程概算投资比重中不断增加,初设概算计列相关费用时还没有形成统一的标准,这对于概算编制质量、技经评审尺度、造价管理会造成不利影响。文章主要从监测费用作为出发点统计分析第三方监测的项目组成、影响因素、计价依据、布点原则、监测周期和频率,结合相关标准、规程、监管要求,固化一些常用方案和造价模块,达到造价合理可控的目的。The third-party monitoring cost of underground excavation power tunnel is increasing in the proportion of project budget investment,and the standard when the initial budget estimate is included in the related expenses,which will have a certain adverse effect on the quality of budget preparation quality,the scale of technical and economic evaluation,cost management.Starting from the monitoring cost,the article mainly analyzes the project composition,influencing factors,valuation basis,layout principle,monitoring period and frequency of the third-party monitoring,and solidifies some common schemes and cost modules in combination with the relevant standards,regulations and regulatory requirements to achieve the goal of reasonable and controllable cost.
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145