检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高金剑 万晶[1] 胡蓝霄 曹珍荣 张世站 朱彦群 GAO Jinjian;WAN Jing;HU Lanxiao;CAO Zhenrong;ZHANG Shizhan;ZHU Yanqun(Department of Construction Engineering Management,Jiangxi Institute of Economic Administrators,Nanchang 330088,China;Key Laboratory of Shaanxi province special stimulation technology for oil and gas fields,Xi′an Petroleum University,Xi′an 710065,China;Pudong Oil Production Plant,Zhongyuan Oilfeild Company,SINOPEC,Puyang 457001,China)
机构地区:[1]江西经济管理干部学院建筑工程管理系,江西南昌330088 [2]陕西省油气田特种增产技术重点实验室(西安石油大学),陕西西安710065 [3]中国石化中原油田分公司濮东采油厂,河南濮阳457001
出 处:《断块油气田》2020年第5期643-646,共4页Fault-Block Oil & Gas Field
基 金:陕西省油气田特种增产技术重点实验室开放基金项目“纳米催化辅助电磁加热超稠油原位炼化实验研究”(KFJJTZ20194)。
摘 要:为了研究页岩气储层压裂改造中支撑剂的沉降规律,研制了多裂缝支撑剂铺置模拟设备,开展了不同裂缝结构、排量以及黏度下的实验。实验结果表明:随着压裂液黏度增加,主干裂缝中砂堤堆积高度减小,砂堤长度增加,砂堤表面变平缓,次级裂缝砂堤堆积高度变小;当排量增加时,主干缝砂堤坡度在裂缝入口端变平缓,在裂缝末端坡度增加,次级裂缝高度减小;对比不同裂缝结构,多裂缝结构的主干缝在节点处砂堤会出现突变,节点处砂堤高度忽然降低,形成“凹点”;次级裂缝数量越多,主干缝砂堤长度越小,“一”形多裂缝为0.55 m,而“T”形多裂缝和“十”形多裂缝的主干缝砂堤长度分别为0.50,0.42 m,减小了9.09%,23.64%。实验研究结果丰富了支撑剂沉降理论。In order to study the rule of proppant placement in shale gas reservoir fracturing,a multi-fracture proppant placement simulation equipment was designed and manufactured.Experiments were carried out under different fracture structures,displacement and viscosity.The experimental results show that:with the increase of the viscosity,the height of the sand bank in the main fracture decreases,the length of the sand bank increases,the surface of the sand bank becomes gentle,and the height of the sand bank in the secondary fracture decreases;when the displacement increases,the slope of the sand bank of the main fracture becomes gentle at the entrance of the fracture,and increases at the end of the fracture,and the height of the secondary fracture decreases;compared with different fracture structures,the main fracture of multi fracture structure will have sudden change at the node,and the height of sand bank at the node will suddenly reduce,forming a"concave point";the more the secondary fractures are,the smaller the sand bank length of the main fracture is.The sand bank lengths in the main fracture of the"一"type fracture,the"T"type fracture and the"十"type fracture are 0.55m,0.50 m and 0.42 m respectively,the lengths of the"T"type fracture and the"十"type fracture are 9.09%and 23.64%less than that of the"一"type fracture respectively.The experimental results enrich the theory of proppant settlement.
关 键 词:多裂缝支撑剂铺置模拟设备 缝网结构 砂堤形状 压裂液 沉降规律
分 类 号:TE357.1[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.224.98