综掘工作面多级除尘系统改进及应用  被引量:3

Improvement and Application of Multi-stage Dedusting System in Fully Mechanized Heading Face

在线阅读下载全文

作  者:赵晓夏 Zhao Xiaoxia(Chongqing Research Institute,China Coal Technology and Engineering Group,Chongqing 400039,China)

机构地区:[1]中煤科工集团重庆研究院有限公司,重庆400039

出  处:《煤矿机械》2020年第9期147-149,共3页Coal Mine Machinery

摘  要:介绍大柳塔煤矿综掘工作面原除尘系统并分析其局限性。在长压短抽局部通风方式下,改进通风除尘参数,优选湿式除尘风机,增加机载控尘系统形成掘进面新除尘系统,并应用于大柳塔矿双煤巷掘进面。结果表明,对于距离连续采煤机15 m范围内的总粉尘和呼吸性粉尘,改进的除尘系统除尘率增幅在20%~50%,除尘率分别提高到90%和80%以上。Introduced the original dedusting system of fully mechanized heading face in Daliuta coal mine and analyzed its limitations.Under the local ventilation mode with long pressure and short extraction,improved the parameters of ventilation and dedusting,optimized and chose the wet dedusting fan,and the mounted dust control system was added to form a new dedusting system at the heading face,and applied in double coal roadway heading face of Daliuta mine.The results showed that for total dust and respirable dust within 15 m of continuous mining machine,the dust removal rate of the improved dedusting system increases by 20%~50%,and the dust removal rate increases more than 90%and 80%respectively.

关 键 词:综掘面 粉尘浓度 多级除尘系统 改进 

分 类 号:TD714.4[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象