检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵永全 Zhao Yongquan(Shanxi Datong Coal Mine Group Hulonggou Coal Industry Co.,Ltd.,Shanxi Shuozhou 036010)
机构地区:[1]山西同煤集团虎龙沟煤业有限公司生产技术部,山西朔州036010
出 处:《山东煤炭科技》2020年第9期85-87,共3页Shandong Coal Science and Technology
摘 要:以虎龙沟煤矿81505综放工作面为研究背景,通过分析煤层注水软化机理,提出合理的钻孔布置方案,确定注水参数,并进行现场注水及效果观测。实践表明:煤层注水后综放工作面各个作业工序的平均降尘率达到50%,工作面的放煤率由原来的78%提升到88%。Taking 81505 fully mechanized caving face in Hulonggou Coal Mine as the research background,through analyzing the softening mechanism of water injection in coal seam,this paper puts forward reasonable drilling layout scheme,determines water injection parameters,and carries out field water injection and effect observation.The practice shows that the average dust fall rate of each working procedure of fully mechanized caving face after coal seam water injection reaches 50%,and the coal caving rate of working face increases from 78% to 88%.
分 类 号:TD714.4[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145