检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于远航 艾远高 王本红 周立成[1] YU Yuan-hang;AI Yuan-gao;WANG Ben-hong;ZHOU Li-cheng(Three Gorges Hydropower Plant,China Yangtze Power Co.,Ltd.,Yichang 443133,China)
机构地区:[1]中国长江电力股份有限公司三峡水力发电厂,湖北宜昌443133
出 处:《水电站机电技术》2020年第9期9-11,71,共4页Mechanical & Electrical Technique of Hydropower Station
摘 要:设计了一种基于电源监视器与小型PLC的双路电源冗余切换控制装置,并以某水电站巨型水电机组动力柜双路电源切换回路为应用实例,从优化装置硬件配置、切换逻辑、提高运行维护效率的角度阐述了设计研发新型切换装置的思路和具体过程。We designed a dual-channel power supply redundancy switching control device based on power supply monitor and small PLC.Besides,we used a dual-channel power supply switching circuit of a gain hydropower unit power cabinet in a hydropower station as an example,and elaborated ideas of designing new switching device and its specific process from points of view including improving hardware operation of device,changing logic and improving efficiency of running safeguard.
分 类 号:TM774[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222