检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘争宏 张龙 郑建国 张炜 于永堂 LIU Zheng-hong;ZHANG Long;ZHENG Jian-guo;ZHANG Wei;YU Yong-tang(College of Geological Engineering and Geomatics,Chang’an University,Xi’an,Shaanxi 710054,China;China JK Institute of Engineering Investigation and Design Co.Ltd.,Xi’an,Shaanxi 710043,China;Shaanxi Key Laboratory for the Property and Treatment of Special Soil and Rock,Xi’an,Shaanxi 710043,China)
机构地区:[1]长安大学地质工程与测绘学院,陕西西安710054 [2]机械工业勘察设计研究院有限公司,陕西西安710043 [3]陕西省特殊岩土与处理重点实验室,陕西西安710043
出 处:《岩土力学》2020年第7期2504-2513,共10页Rock and Soil Mechanics
基 金:陕西省科技统筹创新工程计划项目(No.2016KTZDSF04-05-01);陕西省重大科技成果转化引导专项项目(No.2015KTCG01-08);中国机械设备工程股份有限公司科技研发基金支持项目(No.CMEC-KJYF-2016-06)。
摘 要:使用滑动测微技术进行桩身内力测试,测管安装时的防渗处理是该技术实现高质量测试的关键,已有处理措施鲜有其防渗效果的定量研究。研发了一套滑动测微管抗渗能力测试装置,对3种常用防渗处理措施不同压差下的渗流量进行了测定,得到计算渗流量的公式,结合现场条件分析了测管安装的注意事项。结果表明,测管内压力大时的渗流量要远大于测管外压力大时的渗流量;涂胶是一种效果非常好的防渗措施,采用该措施后一般不会有超过0.005 mm粒径的颗粒进入测管;增加测管内水头有利于减少杂质进入测管,但测管内水头不能高出桩孔内液面太多;灌注混凝土后,若测管内有水溢出应封闭测管限制水的溢出,若测管内水位下降,则应开放测管允许气体进入测管。It is a way to measure the internal force of pile foundation by sliding micrometer,and the anti-seepage measures during the installation of sliding micrometer tube are the key to achieve high quality test,while quantitative research on anti-seepage effect of measures is rare.A set of device for testing the anti-seepage ability of sliding micrometer tube was developed.The seepage flow of three common anti-seepage measures under different pressure differences was tested,and a formula for calculating the seepage flow was developed.The matters needing attention in the installation of the sliding micrometer tube were analyzed according to the site conditions.Test results show that when the internal pressure is higher than the external pressure,the seepage flow rate is much larger than that when the external pressure is larger than the internal pressure.Glue coating is a very effective anti-seepage measure,and generally no particles with a diameter over 0.005 mm will enter the sliding micrometer tube after adopting this measure.Increasing the water head in the sliding micrometer tube is beneficial to reduce impurities entering it,but the water head in the sliding micrometer tube can not be too much higher than the liquid levels in the borehole of the pile.After pouring concrete,if water overflow in the sliding micrometer tube happens,the orifice of the sliding micrometer tube should be closed to limit water overflow,and if the water level in the sliding micrometer tube falls,the orifice of the sliding micrometer tube should be opened to allow gas to enter it.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171