黄河下游整治工程续建后对河势控导效果影响  被引量:4

Effect of River Regime Control After Continuation of Training Projects in the Lower Yellow River

在线阅读下载全文

作  者:刘燕[1] 李军华[1] 董其华[1] 余康哲 LIU Yan;LI Junhua;DONG Qihua;YU Kangzhe(Yellow River Institute of Hydraulic Research,YRCC,Zhengzhou 450003,China;North China University of Water Resources and Electric Power,Zhengzhou 450046,China)

机构地区:[1]黄河水利委员会黄河水利科学研究院,河南郑州450003 [2]华北水利水电大学,河南郑州450046

出  处:《人民黄河》2020年第9期86-89,共4页Yellow River

基  金:“十三五”国家重点研发计划项目(2018YFC0407406-05)。

摘  要:随着小浪底水库的投入运用,进入黄河下游的水沙条件发生很大变化,因部分河道整治工程与新的水沙关系不匹配,下游河势极易发生调整,使得现有流路与规划流路不一致,一些河段出现畸形河势。通过开展黄河下游河道综合治理工程推荐方案模型试验研究工作,来检验工程续建后对河势的影响。对比工程现状方案和拟建方案的试验结果发现,拟建方案不利河势的调整部位较现状方案多,拟建方案有利于河势向规划流路调整,河势基本稳定。As the Xiaolangdi Reservoir was put into operation,the water and sediment conditions entering into the lower Yellow River have been changed greatly.Because some river training projects do not match the new water and sediment relations,the river regime in the lower reaches is very easy to be adjusted,which makes the existing flow path inconsistent with the planned one and abnormal river regimes have e⁃merged in some sections of the river.In order to test the influence of the continuation of training projects to the river regime,the model test of the recommended scheme of the comprehensive treatment project in the lower Yellow River was carried out.By comparing the test results be⁃fore and after the continuation of the project,it is found that the proposed scheme has more adjustment parts to the unfavorable river regime than the current scheme.The proposed scheme is conducive to the adjustment of the river regime of the planned flow path and basically stabi⁃lizing the river regime.

关 键 词:河势 现状方案 拟建方案 规划流路 黄河下游 

分 类 号:TV85[水利工程—水利水电工程] TV882.1

 