航天项目计划缓冲区尺寸确定方法研究  被引量:1

Research on Buffer Size Determination of Aerospace Project Scheduling

在线阅读下载全文

作  者:张沁生[1] 赵长见[1] 赵蕊[1] 李璞[1] 程永欣 Zhang Qin-sheng;Zhao Chang-jian;Zhao Rui;Li Pu;Cheng Yong-xin(China Academy of Launch Vehicle Technology,Beijing,100076)

机构地区:[1]中国运载火箭技术研究院,北京100076

出  处:《导弹与航天运载技术》2020年第5期109-115,共7页Missiles and Space Vehicles

摘  要:根据新一代航天项目管理信息化系统建设需求,分析了缓冲区计算方法需满足的条件。以模糊理论为基础,给出了活动工期、执行时间、安全时间以及缓冲区大小估计及确定方法。利用真度值h取值的灵活调整,可以使得计算所得执行时间、缓冲区大小符合航天项目实际。此外,以算例对该方法的项目完工时间进行了模拟、验证。According to the construction requirements of space project management information system,the requirements of buffer size calculation method is analyzed.Based on fuzzy theory,the methods of estimating and determining for execution duration,safety time and buffer size are given.With the flexible adjustment of true value h,the calculated execution time and buffer size can be in line with the actuation of the space program.In addition,the completion time of the project adopting this method is simulated and verified by an example.

关 键 词:关键链 缓冲区 模糊理论 项目计划 

分 类 号:F402.1[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象