检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:路再红 盛燕萍[2,3] 贾海川 曹露 邢明亮 陈华鑫[2,3] LU Zai-hong;SHENG Yan-ping;JIA Hai-chuan;CAO Lu;XING Ming-liang;CHEN Hua-xin(Inner Mongolia Transportation Design & Research Institute Co.,Ltd.Hohhot,Inner Mongolia 010000,China;Transportation Paving Materials Engineering Research Center of Ministry of Education,Xi’an,Shaanxi 710061,China;School of Materials Science and Engineering,Chang’an University,Xi’an,Shaanxi 710061,China)
机构地区:[1]内蒙古交通设计研究院有限责任公司,内蒙古呼和浩特010000 [2]交通铺面材料教育部工程研究中心,陕西西安710061 [3]长安大学材料科学与工程学院,陕西西安710061
出 处:《内蒙古工业大学学报(自然科学版)》2020年第4期296-304,共9页Journal of Inner Mongolia University of Technology:Natural Science Edition
摘 要:冬季路面经常会出现积雪结冰现象,在车辆行驶反复荷载的作用下,积雪融化易形成薄冰层,降低了沥青路面的防滑性能.本文针对冬季雨雪天气下高速公路存在除雪困难的问题,从确定高速公路的冰雪区划入手,根据高速公路沿线的地形环境和气候条件确定其所处的冰雪区域,分析了控雪除冰的影响因素和融雪材料的不同特点,明确了融雪材料的使用时机,在此基础上根据影响因素模块、初始操作模块、后续操作模块以及处理数据存储记录模块四个模块建立了高速公路冰雪控制决策系统,并以西汉高速为例,阐明了决策系统的构建过程和实现途径.研究结果显示,根据西汉高速的地形及自然条件,合理选择融雪材料类型,使用范围,使用时机,以及是否采取除雪设备及组合形式等,确定出在不同积雪结冰条件下的控雪除冰措施.Roads often experience snow and icing in winter.Under the action of repeated loads of vehicles,the melting of snow can easily form a thin layer of ice,which reduces the anti-skid performance of asphalt pavements.Aiming at the problem of snow removal difficulties on highways in winter rain and snow,starting with determining the ice and snow areas of the highways,this article first determines the ice and snow areas according to the terrain environment and climatic conditions along the highway,then analyzes snow control and deicing influencing factors and the different characteristics of the snow-melting materials,and then suggests the timing of the use of the snow-melting materials.On this basis,the highway ice and snow control decision-making system is established comprising the influencing factor module,the initial operation module,the subsequent operation module and the processing data storage and recording module.Taking the Xi’an to Hanzhong highway as an example,this paper explains the construction process and realization way of the decision-making system.The research results show that based on the terrain and natural conditions of the Xi’an to Hanzhong highway,reasonable choice of the type of snow melting material,the scope of use,the timing of use,as well as whether to adopt snow removal equipment or to adopt other combinational measures,etc.,to determine snow control and deicing measures under different snow and icing conditions.
关 键 词:道路工程 控雪除冰 融雪材料 决策系统 西汉高速
分 类 号:U415[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249