援外成套项目可行性考察的常见问题及对策  被引量:1

The Common Problems and Countermeasures for the Feasibility Investigation in Complete China-aid Projects

在线阅读下载全文

作  者:马子皓 刘永锋 刘珊珊 MA Zihao;LIU Yongfeng;LIU Shanshan(Guangdong International Engineering Consulting Co.,Ltd,Guangzhou 510060,China)

机构地区:[1]广东省国际工程咨询有限公司,广东广州510060

出  处:《建筑经济》2020年第10期34-37,共4页Construction Economy

摘  要:通过对可行性考察的工作重点及突出问题的梳理及分析,采用问题导向的研究方法,从宏观及微观两个层面,对如何解决突出问题、提升工作质量提出应对策略。该对策的应用有利于规避对外援助成套项目可行性考察过程中可能出现的不良行为,同时也为相关政策及标准的制定提供了素材。Through concluding and analyzing the key points and outstanding problems of feasibility investigation,the paper provides relevant countermeasures for solving the outstanding problems and improving the quality of work from the macroscopic and microscopic levels based on the problem-oriented research method.The countermeasures are helpful to avoid the bad behavior during the feasibility investigation,and are also a source provided to formulate relevant policy and standard for complete China-aid projects.

关 键 词:前期决策 对外援助成套项目 可行性考察 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象