喀麦隆Mekin水电站工程台阶式溢流坝设计  被引量:2

Design of stepped overflow dam for Mekin Hydropower Station in Cameroon

在线阅读下载全文

作  者:范鹏 FAN Peng(Liaoning Water Conservancy and Hydropower Survey and Design Research Institute Co.,Ltd.,Shenyang 110006,China)

机构地区:[1]辽宁省水利水电勘测设计研究院有限责任公司,辽宁沈阳110006

出  处:《水利建设与管理》2020年第9期30-33,82,共5页Water Conservancy Construction and Management

摘  要:喀麦隆Mekin水电站工程地处热带雨林气候区,具有来水流量较大、水头较低、水库调节库容小、下游河道抗冲刷较弱的特点。为解决大流量下传统消能设施结构布置复杂、投资较大的设计难题,本工程通过溢流坝下游消能方式比选,成功运用台阶消能的原理,取消了坝下消能设施,节省了大量工程投资,下游消能问题得到圆满解决,可供类似工程参考。Cameroon Mekin Hydropower Station Project is located in the tropical rain forest climate area.It has the characteristics of large inflow,low head,small regulated reservoir capacity and weak resistance to erosion in the downstream channel.The principle of stepped energy dissipation is successfully applied through overflow dam downstream energy dissipation method comparison in the paper in order to solve the design difficulties of complex structure layout and large investment of traditional energy dissipation facilities under large flow.The energy dissipation facilities under the dam are canceled,thereby saving a large amount of engineering investment.Downstream energy dissipation problem is satisfactorily solved.The design methods can be used for reference in the similar projects.

关 键 词:Mekin水电站 台阶式溢流坝 消能措施 

分 类 号:TV652.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象