检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙昊苏 胡晓斌 郝雪松 SUN Haosu;HU Xiaobin;HAO Xuesong(Daning Management Office,Beijing South-to-North Water Diversion Project,Beijing 102442,China)
出 处:《水利建设与管理》2020年第9期51-54,共4页Water Conservancy Construction and Management
摘 要:为配合南水北调中线干线工程排空检修,做好大宁调蓄水库高水位蓄水期间的保障工作,水库管理部门积极筹划、周密部署,从组织保障、工程运行管理、调度运行管理、值班值守、应急保障管理、后勤保障及环境卫生管理等几方面着手,采取了一系列措施,有效地保证了水库运行安全,可为其他水库高水位运行管理工作提供有益的参考。The reservoir management departments actively plan and deploy carefully in order to cooperate with the emptying maintenance in main route of South-to-North Water Transfer Project,and complete the security work during the high water level storage in Daning Regulating Reservoir.A series of measures are adopted to effectively guarantee the safe operation of the reservoir from the aspects of organizational guarantee,project operating management,scheduling operation management,duty,emergency safeguard management,logistics guarantee,environmental health management,etc.And the paper can provide beneficial reference for high water level running management in other reservoirs.
分 类 号:TV697.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68