检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:方朝君[1] 冯炳全 庞毅 胡波 赵伟 FANG Zhaojun;FENG Bingquan;PANG Yi;HU Bo;ZHAO Wei(Xi'an Thermal Power Research Institute Co.,Ltd.Suzhou Branch,Suzhou 215153,China;Guangzhou China Resources Thermal Power Co.,Ltd.,Guangzhou 511400,China;Tianjin SDIC Jinneng Power Co.,Ltd.,Tianjin 300480,China)
机构地区:[1]西安热工研究院有限公司苏州分公司,江苏苏州215153 [2]广州华润热电有限公司,广东广州511400 [3]天津国投津能发电有限公司,天津300480
出 处:《中国电力》2020年第10期224-230,共7页Electric Power
基 金:华能集团总部科技项目(燃煤机组耦合生物质发电关键技术研究HNKJ18-H09)。
摘 要:依托煤电机组高效的污染物处理设施处置生活污泥是较优的技术选择。针对燃煤锅炉改造同时具备掺烧湿污泥和干污泥(含水率分别约为80%、30%)能力的工程实例,研究耦合掺烧带来的臭气和干化污水问题,并对其处理系统进行设计优化。污泥接收、干化、输送等环节产生的臭气采用车间整体微负压控制和干化系统局部抽负压方式收集,集中送入二次风箱系统后,进入炉膛,利用高温燃烧除臭。污泥处置过程中的污水与有机污染物浓度较低的厂区生活污水混合,进入后续生化处理环节,最后送至现有工业废水中间水池回用,不发生外排。通过上述改进,避免了污泥耦合掺烧过程中产生的二次污染,为其他同类燃煤锅炉耦合污泥改造工程提供参考。It is a more preferable choice to process the household garbage with high-efficiency pollutant treatment facilities of coalfired power generating units. Regarding a coal-fired power generating unit capable of firing both wet and dry sewage sludge(with the water contents of about 80% and 20% respectively) in the transformation project, this paper conducts the study on the odor and the sewage generated during the sludge drying process from the coupling combustion in the coal-fired boiler. Also it proposes the optimization design for their treatment system. The odor produced in the stages of receiving, drying and transportation of sludge is collected by the overall micro-negative pressure control of the workshop and the local negative-pressure pumping of the drying device, then through the secondary air bellows system fed into the boiler, and eventually eliminated completely after high temperature combustion. The condensed sewage is mixed into the domestic sewage with low organic pollutant concentration, then treated in the subsequent biochemical treatment process and finally flows into the intermediate water pool for the existing industrial wastewater and hence recycled without any external discharge. With these improvements, the potential secondary pollution that may occur in the process of sludge coupling disposal has been avoided. The design can provide references for the transformation project of other similar coal-fired boilers coupling with sludge disposal.
分 类 号:TM621.2[电气工程—电力系统及自动化] X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195