隧道开挖对邻近桩基影响的两阶段分析方法  被引量:3

Two-stage Analysis Method for the Influence of Tunnel Excavation on Adjacent Pile Foundations

在线阅读下载全文

作  者:张坤勇[1,2] 徐娜[2] 臧振君 王乾坤 张彦红 ZHANG Kunyong;XU Na;ZANG Zhenjun;WANG Qiankun;ZHANG Yanhong(Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering,Hohai University,Nanjing 210024,China;Geotechnical Engineering Institute,Hohai University,Nanjing 210024,China;Housing and Urban-rural Development Bureau of Suqian,Jiangsu,Suqian 223800,China;Shanghai municipal engineering design instiuation(Group)Co.,Ltd.Shanghai 200092,China;China Railway(Shanghai)Investment Group Co.Ltd,Shanghai 200135,China)

机构地区:[1]河海大学,岩土力学与堤坝工程教育部重点实验室,江苏南京210024 [2]河海大学岩土工程科学研究所,江苏南京210024 [3]江苏省宿迁市住建局,江苏宿迁223800 [4]上海市政工程设计研究总院(集团)有限公司,上海200092 [5]中铁(上海)投资集团有限公司,上海200135

出  处:《河北工程大学学报(自然科学版)》2020年第3期57-63,共7页Journal of Hebei University of Engineering:Natural Science Edition

基  金:国家自然科学基金资助项目(41530637,51578214)。

摘  要:隧道开挖过程中必然引起周围土体的侧向移动,从而使邻近桩基产生水平变形和附加弯矩。目前有限元数值模拟法建模与计算过程较为繁琐,为了解决隧道开挖下桩土相互作用问题,基于Winkler地基模型,采用两阶段分析方法,建立了隧道开挖条件下被动桩受力分析模型,推导出桩土相互作用控制方程,并基于有限差分思想给出近似解的形式。最后结合工程实例表明,该近似解与现场监测数据较为吻合,能够有效地分析隧道开挖对邻近桩基的影响。The excavation of the tunnel will inevitably cause the lateral movement of the surrounding soil,which will cause horizontal deformation and additional bending moments of adjacent pile foundations.At present,the modeling and calculation process of finite element numerical simulation is relatively tedious.In order to solve the problem of pile-soil interaction under tunnel excavation,based on Winkler foundation model,a two-stage analysis method was used to establish a passive pile stress analysis under tunnel excavation conditions.The governing equation of pile-soil interaction was derived and the approximate solution is given based on the finite difference idea.Finally,the results combined with the engineering example shows that the approximate solution is in good agreement with the field monitoring data and can effectively analyze the influence of tunnel excavation on adjacent pile foundations.

关 键 词:隧道开挖 WINKLER地基模型 桩土相互作用 解析解答 

分 类 号:TU43[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象