检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵亚帆 Zhao Yafan(Jinbei Coal Industry Company,Huozhou Coal and Electricity Group,Jingle Shanxi 035100,China)
机构地区:[1]霍州煤电集团晋北煤业公司,山西静乐035100
出 处:《同煤科技》2020年第5期38-40,共3页Datong Coal Science & Technology
摘 要:本文针对晋北煤业5-103工作面过空巷时巷道围岩变形特征和围岩变形机理进行了分析,得到支护强度大于3.65 MPa是安全充填作业的保障,经过现场充填和工作面调斜方案,控制了巷道围岩的变形,提高了工作面的推进速率。This paper analyzes the deformation characteristics and deformation mechanism of surrounding rock of 5-103 working face crossing gob of Jinbei coal industry.It is concluded that the filling operation is safe when the support strength is greater than 3.65MPa.The deformation of surrounding rock of roadway is controlled and the advancing speed of working face is improved by filling on site and adjusting inclination of working face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.30.3