检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴纯刚 WU Chungang(Sinosteel Mining Co.,Ltd.)
出 处:《现代矿业》2020年第9期91-93,共3页Modern Mining
摘 要:在详细介绍一期系统工程的基础上,提出进行深部开拓工程建设,以达到提高产能之目的,提出多方案比较,经过技术经济论证,最终确定皮带斜井运输与一期破碎下部矿仓无缝对接方案,解决了深部矿岩二次提运问题,节省了成本,取得了理想效果,为类似矿山深部开拓工程建设提供了很好范例。Based on the detailed introduction of the first-phase system engineering,it is proposed to carry out deep exploitation project construction to achieve the purpose of increasing productivity.For this purpose,several schemes are compared.After technical and economic demonstrations,the seamless docking scheme between belt-inclined mine transportation and the first-phase crushed lower ore bin is finally determined,which solves the problem of secondary transportation of deep mine,saves costs and achieves ideal results.The construction of deep exploitation project provides a good example for other similar projects.
分 类 号:TD861.1[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200