检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈曙腾 Chen Shuteng(Guangdong No.2 Construction Engineering Co.,Ltd.Shantou 515041,China)
机构地区:[1]广东省第二建筑工程有限公司,广东汕头515041
出 处:《广东土木与建筑》2020年第10期61-64,共4页Guangdong Architecture Civil Engineering
摘 要:结合汕头东海岸某项目在吹填造陆后的新场区上进行工程建设的实例,介绍在欠固结、高压缩性软土地基的填海陆域上,研究并采取施工技术措施,提高上层软基硬度、保证建筑嵌固稳定层效果的建筑设计和施工成套技术。该技术的实施,成功实现了在全面软弱地基场区上快速建造运动会场馆及其配套设施的目标,全面实现预设技术指标。Combined with a project in shantou east coast reclamation epeirogenic engineering construction on the new district as an example,introduced in less consolidation,high compressibility on the land reclamation of soft soil foundation,the research and construction technical measures,improve the hardness of the upper soft foundation,guarantee the stability of buildings built in architectural design and construction technology of layer effect.The implementation of this technology has successfully achieved the goal of rapidly constructing the sports venue and its supporting facilities on the comprehensive weak foundation area,and fully realized the preset technical targets.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145