检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张洪军 ZHANG Hongjun(Zhongke Xinde Construction Co. , Ltd. , Chengdu 610057, China)
出 处:《中国水能及电气化》2020年第9期64-69,共6页China Water Power & Electrification
摘 要:委内瑞拉托科玛水电站溢洪道左岸边坡长约500m,位于委内瑞拉卡罗尼河下游,设计工程中将溢洪道边坡从上游向下游划分为Ⅰ~Ⅳ四个区域。在右岸边坡开挖施工中发现,Ⅱ区实际覆盖层厚度大于前期的预判,文章主要对溢洪道边坡Ⅱ区未采取支护措施情况下开挖边坡进行稳定计算,并根据计算成果确定支护方案,从而对支护后的边坡稳定开展计算,最终确定锚索间距及锚固长度。The left bank slope of the spillway in Venezuela Tocoma Hydropower Station is about 500m long.It is located in the lower reaches of Venezuela Caroni River.The spillway slope is divided into four zones ofⅠ~Ⅳfrom the upstream to the downstream in the design project.It is found in the right bank slope excavation that the actual overburden thickness of zoneⅡis greater than the previous prediction.The excavation slope stability is calculated in the paper mainly under the condition that the spillway slopeⅡarea is not provided with supporting measures.The support scheme is determined according to calculation results.The slope stability after supporting is calculated,thereby ultimately determining the anchor cable spacing and anchor length.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147