检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈亚思 熊龙兵 SHEN Ya-si;XIONG Long-bing(ChinaPower Zhongnan Corporation Limited,Changsha 410014,China)
机构地区:[1]中国电建集团中南勘测设计研究院有限公司,长沙410014
出 处:《价值工程》2020年第30期64-65,共2页Value Engineering
摘 要:湖南真乡风电场工程范围大,山区地势复杂,道路条件不理想,风电建设面临许多投资控制的问题,针对这些问题,风电总承包项目部始终贯彻“投资前策划,投资中控制,投资后分析考核”的指导思想,探讨出合理的投资控制方法和主要措施,通过编制执行概算、分标方案、招标控制价、加强合同变更与索赔、进行建造合同评审等,对工程投资进行了有效的控制。Hunan Zhenxiang Wind Farm has a large project scope,complex mountainous terrain and unsatisfactory road conditions.Wind power construction faces many investment control problems.In response to these problems,the wind power general contracting project department has always implemented the guiding ideology of"pre-investment planning,investment control,post-investment analysis and assessment",and explored reasonable investment control methods and main measures.The project investment was effectively controlled through the preparation and execution of budget estimates,bid sub-bidding plans,bidding control prices,strengthening contract changes and claims,and conducting construction contract review.
关 键 词:投资控制 执行概算 分标方案 招标控制价 合同管理 建造合同评审 真乡风电场
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.151