检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王建东 WANG Jian-dong(The First Engineering Co.,Ltd.of China Railway 12th Bureau Group,Xi'an 710038,China)
机构地区:[1]中铁十二局集团第一工程有限公司,西安710038
出 处:《价值工程》2020年第30期145-148,共4页Value Engineering
摘 要:结合福州绕城公路东南段A7合同段琅岐特大桥1号桥主跨3×40m连续梁支架现浇施工实例,对于大尺寸及大体积的连续梁现浇采用WDJ型碗扣件搭设满堂支架,跨越地方道路采用贝雷桁架纵梁+钢管柱支墩设置大跨度通车门洞方案,支架结构承载能力验算方法进行了详细的阐述。为此类现浇连续梁支架方案提供借鉴。Combined with the construction example of the 3×40m cast-in-situ continuous beam support for the main span of the Langqi Bridge No.1 Bridge of the A7 contract section of the southeast section of the Fuzhou Ring Road,the large-size and large-volume cast-in-place continuous beam using WDJ bowl fasteners to set up full support,the scheme of using Bailey truss longitudinal beam+steel pipe column buttress to set large-span opening to traffic across local roads,and the checking method of bearing capacity of support structure are described in detail,which provides reference for this kind of cast-in-place continuous beam support scheme.
关 键 词:现浇连续梁 满堂支架 大跨度门洞 WDJ型碗扣件 贝雷桁架 验算
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28