检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邓林峰 黄威 杜垚 朱扬 贺健 DENG Lin-feng;HUANG Wei;DU Yao;ZHU Yang;HE Jian(China Construction Second Engineering Bureau Co.,Ltd.,100010,Beijing,China)
机构地区:[1]中国建筑第二工程局有限公司西南分公司,北京100010
出 处:《建筑技术》2020年第10期1167-1169,共3页Architecture Technology
摘 要:华丽高速公路第20合同段施工中,分析人工挖孔桩地处滑坡地质和雨期施工等不利因素,在边坡防护、人身安全防护、机械施工防护、雨期施工措施、用电安全保护、脚手架使用等方面制订技术措施并建立了应急机构,避免了安全风险,保证了施工安全。Considering the adverse conditions,such as landslide risk and rain season construction of the manual digging pile project during construction of the 20th contracted segment of Huaping-Lijiang expressway,technical measures were designed and emergence group was formed for side slope protection,body safety protection,equipment construction protection,rain season construction measures,electricity safety protection and scaffold application,etc.,to avoid safety risk and guarantee construction safety.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117