桥梁工程先简支后连续T梁施工管理  被引量:1

CONSTRUCTION MANAGEMENT OF T-BEAMS IN BRIDGE ENGINEERING

在线阅读下载全文

作  者:高利武 王勇 罗长翔 黄国剑 谭闯 GAO Li-wu;WANG Yong;LUO Chang-xiang;HUANG Guo-jian;TAN Chuang(China Construction Second Engineering Bureau Co.,Ltd.,100010,Beijing,China)

机构地区:[1]中国建筑第二工程局有限公司西南分公司,北京100010

出  处:《建筑技术》2020年第10期1224-1226,共3页Architecture Technology

摘  要:先简支后连续T梁是近年研发的一种桥梁施工新工艺,与传统施工方式相比,该工艺施工效率和施工质量表现更优。华丽高速公路第20合同段施工中,通过分析桥梁工程先简支后连续T梁施工管理,研究其施工技术要点,制订了施工管理技术方案,总结了桥梁工程先简支后连续T梁施工经验,可为类似工程樹共借鉴。First simply supported and then continuous T-beam is a new bridge construction technology developed in recent years.Compared with traditional construction methods,this technology has better construction efficiency and construction quality.During the construction of the 20th contract section of Huaihua Expressway,we analyzed the construction management of the bridge project with simple support and then continuous T-beam,studied its construction technical points,formulated construction management technical plans,and summarized the bridge project’s experience in the construction of bridge projects with simple support and continuous T-beam,to provide reference for similar projects.

关 键 词:桥梁工程 先简支后连续 施工管理 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象