检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邵亚平 崔松 陈寅 周玉成 刘立顺 SHAO Yaping;CUI Song;CHEN Yin;ZHOU Yucheng;LIU Lishun(Xinjiang Kalatongke Mining Co.,Ltd.,Fuyun 836107,China;BGRIMM Technology Group,Beijing 102628,China;National Centre for International Research on Green Metal Mining,Beijing 102628,China)
机构地区:[1]新疆喀拉通克矿业有限责任公司,新疆富蕴836107 [2]矿冶科技集团有限公司,北京102628 [3]国家金属矿绿色开采国际联合研究中心,北京102628
出 处:《中国矿业》2020年第S02期329-335,共7页China Mining Magazine
摘 要:充填体下进行矿体回采时采场的稳定性至关重要,合理的采场结构参数对保障采场安全高效的回采起重要作用。以喀拉通克铜镍矿2#矿床东段矿体为工程背景,基于现场充填体假顶厚度,通过荷载传递交汇线理论、跨厚度比法、国外经验图表法和经验类比法预估采场极限跨度,并利用FLAC3D数值模拟软件对7m、8m和9m3种采场跨度方案进行数值模拟研究,分析不同采场跨度对围岩位移场与应力场变化及塑性区扩展规律的影响,确定在充填体假顶作用下最优的采场结构参数。研究结果表明:当采场跨度为8m时,既能保证采场稳定性,又能最大程度发挥采场生产能力。The stability of the stope is very important when the ore body is mined under the filling body.Reasonable stope structure parameters play an important role in ensuring the safe and efficient mining of the stope.Taking the east section of No.2 ore body in karatongke copper nickel mine as the engineering background,based on the thickness of filling body false roof,the limit span of stope is estimated by load transfer intersection line theory,span thickness ratio method,foreign experience chart method and empirical analogy method.FLAC 3D numerical simulation software is used to study the three stope span schemes of 7 m,8 m and 9 m.The influence of different stope spans on the variation of displacement field and stress field of surrounding rock and the expansion law of plastic zone are analyzed,and the optimal stope structure parameters under the action of filling body false roof are determined.The research results show that when the stope span is 8 m,it can not only ensure the stability of the stope,but also maximize the production capacity of the stope.
分 类 号:TD853[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28