作 者:吴伟伟 李英勇 史彬 WU Weiwei;LI Yingyong;SHI Bin(PowerChina Huadong Engineering Corporation Limited)
机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311122
出 处:《大坝与安全》2020年第4期17-22,共6页Dam & Safety
摘 要:卡拉水电站水头高、流量大、河谷狭窄且地质条件复杂,泄洪消能设计难度较大。根据工程特点,通过对“宽尾墩-跌坎消力池”消能和大差动挑流消能这两种消能型式的综合比选,确定采用“宽尾墩-跌坎消力池”消能型式,并结合水工模型试验,对宽尾墩体型、消力池断面型式及尾坎高程等进行了优化和深入研究,为今后类似工程的泄洪消能设计提供参考。The flood discharge and energy dissipation design of Kala hydropower station,which has the characteristics of high water head,large discharge,narrow river valley and complex geological conditions,is very difficult.According to these characteristics,and through comprehensive comparison between two types of energy dissipators,i.e."flaring pier and stilling basin with drop sill"and differential ski-jump energy dissipation,the former has been selected.Combined with the hydraulic model test,the flaring pier configuration,section of stilling basin and end sill elevation have been optimized and further studied to provide a reference for the design of flood discharge and energy dissipation of similar projects.
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229