检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵海波[1] ZHAO Hai-bo(Liaoning Provincial Baishi Reservoir Administration CO.LTD,Chaoyang 122000,China)
机构地区:[1]辽宁省白石水库管理局有限责任公司,辽宁朝阳122000
出 处:《黑龙江水利科技》2020年第10期10-13,共4页Heilongjiang Hydraulic Science and Technology
摘 要:为揭示大凌河河道洪水受河滩湿地的影响作用,基于率定的一维模型构造平面二维数学模型,定量模拟河道水位、流场形态受有无过水涵洞和有无湿地工况的影响。研究表明:湿地具有明显的消峰缓流、防洪泄洪功能,涵洞降低流速差、水位差及减少环流作用显著。研究成果可为流域防洪规划和洪水治理提供决策依据。In order to reveal the roles of the Daling river flood affected by the flood wetland,a planar two-dimensional mathematical model is constructed based on a one-dimensional model with rate-setting,and the shape of water level flow field is influenced by the conditions of whether there are overwater culverts and whether there are wetlands.The study shows that:the wetland has obvious function of peak elimination and slow flow flood control and discharge,and culverts have obvious effect of reducing velocity difference,water level difference and circulation,and the research results can provide decision basis for flood control planning and flood control in river basin.
分 类 号:TV85[水利工程—水利水电工程] TV122
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157