检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈素华[1,2] 丁建明 姜严旭[2] 于智光 林峰 CHEN Suhua;DING Jianming;JIANG Yanxu;YU Zhiguang;LIN Feng(School of Transportation,Southeast University,Nanjing 210096,Jiangsu,China;Architectural Design Research Institute Co.,Ltd.,Southeast University,Nanjing 210096,Jiangsu,China)
机构地区:[1]东南大学交通学院,江苏南京210096 [2]东南大学建筑设计研究院有限公司,江苏南京210096
出 处:《重庆交通大学学报(自然科学版)》2020年第10期43-48,共6页Journal of Chongqing Jiaotong University(Natural Science)
基 金:国家自然科学基金青年基金项目(71302138)。
摘 要:利用BIM技术以及参数化设计方法对复杂景观桥梁设计展开研究,基于Rhinoceros软件建立全桥参数化BIM模型,研究了BIM技术在桥梁方案设计,结构优化,设计合理性检查,工程量统计以及辅助出图等方面的应用。同时实现BIM模型与实体有限元软件之间的数据对接,着重分析异形索塔的力学特性。研究表明:BIM技术与参数化设计作为桥梁三维正向设计的基础,在工程设计阶段可有效控制设计误差,提高设计效率及质量。异形索塔力学分析表明:索塔整体受力以受压为主,锚固区由于环向预应力的施加,具有较高的压应力安全储备,各向应力水平均在可控范围之内。为BIM技术在桥梁工程设计阶段的应用提供了一个有效的技术路线。The BIM technology and parameterized design method were used to study the complex landscape bridge design.Based on Rhinoceros software,the full bridge parameterized BIM model was established.The application of BIM technology in bridge scheme design,structure optimization,design rationality check,engineering quantity statistics and auxiliary design drawing was studied.At the same time,the data docking between the BIM model and the finite element software was realized.And the mechanical properties of the special-shaped cable tower were analyzed emphatically.The research shows that BIM technology and parameterized design are the basis of three-dimensional forward design of bridge,which can effectively control design errors and improve design efficiency and quality in engineering design stage.The mechanical analysis of the special-shaped cable tower shows that the overall stress of the cable tower is mainly under pressure,and the anchorage zone has a relatively higher safety reserve of compressive stress due to the application of circumferential prestress.The stress levels in all directions are within the controllable range.It provides an effective technical route for the application of BIM technology in the design stage of bridge engineering.
关 键 词:桥梁工程 景观桥梁 BIM技术 参数化设计 异形索塔 力学性能
分 类 号:U442[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3