检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:武文君 Wu Wenjun(Yungang Mine,Datong Coal Mine Group,Shanxi Province,Shanxi Datong 037017)
出 处:《山东煤炭科技》2020年第10期27-28,31,共3页Shandong Coal Science and Technology
摘 要:81121工作面进风顺槽沿底留顶煤掘进,因煤层松软,抗扰动能力差,围岩难以控制,导致掘进期间顶煤冒落事故频发,掘进效率低下,设计了“超前管棚+超前预注”加固方案来提高围岩的稳定性。试验结果表明:加固方案能有效提高巷道围岩的稳定性,掘进期无顶煤冒落事故发生,日掘进进尺从1.6 m/d提高到5 m/d。Retaining top coal along the bottom is adopted in the air inlet chute of 81121 working face.Because the coal seam is soft,the anti-disturbance ability is poor,the surrounding rock is difficult to control,which leads to frequent coal caving accidents and low tunneling efficiency.In order to improve the stability of surrounding rock,the reinforcement scheme of"advance pipe roof+advance pre injection"is designed.The test results show that the reinforcement scheme can effectively improve the stability of the surrounding rock of the roadway,and no roof coal caving accident occurs during the excavation period,and the daily driving advance is increased from 1.6 m/d to 5 m/d.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.233