巷道过超高冒落区安全掘进技术研究  

Research on Safe Driving Technology of Roadway Passing Over High Falling Area

在线阅读下载全文

作  者:郭伟[1] Guo Wei(Jincheng Coal Industry Group Zhaozhuang Coal Mine,Shanxi Jincheng 048000)

机构地区:[1]山西晋煤集团赵庄煤业开拓二队,山西晋城048000

出  处:《山东煤炭科技》2020年第10期65-68,共4页Shandong Coal Science and Technology

摘  要:针对赵庄煤业运输顺槽过超高冒落区问题,根据冒落区形态制定了“底部冒落碎矸注浆+顶部空洞充填”治理方案,并制定掘进期间二次浅孔注浆和锚索补强支护方案。实施结果表明:掘进期间固结体粘接良好,8 d安全通过12 m冒落区,掘进后巷道变形量极小,15 d后基本不再变化。In view of the problem that Zhaozhuang Coal Industry's transportation gateway passes through the ultra-high caving area,according to the shape of the caving area,the treatment scheme of"bottom caving broken gangue grouting+top cavity filling"is formulated,and the secondary shallow hole grouting and anchor cable reinforcement support scheme during the excavation period are formulated.The implementation results show that:during the driving period,the consolidation body is well bonded,passing through the 12 m caving area safely in 8 days,the roadway deformation is very small after driving,and it basically does not change after 15 days.

关 键 词:掘进 冒落区 充填 注浆 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象