作 者:张品峰 Zhang Pinfeng(China Coal No.71 Construction Co.,Ltd.,Anhui Suzhou 234000)
机构地区:[1]中煤第七十一工程处有限责任公司,安徽宿州234000
出 处:《山东煤炭科技》2020年第10期152-153,158,共3页Shandong Coal Science and Technology
摘 要:为解决营盘壕煤矿矿井整体建设计划中出现的矛盾,并确保工程施工安全,在风井临时改绞期间,利用主井设置水平临时提升系统,实现主井井壁注浆、人员及物料上下,增加临时安全出口,达到解决矛盾、保障安全的目的。In order to solve the contradictions in the overall construction plan of the Yingpanhao Coal Mine,speed up the construction progress of the mine,and ensure the safety of the project construction,during the temporary stranding of the air shaft,the main shaft is used to set up a temporary horizontal lifting system,to achieve the grouting of the main shaft wall,the up and down of personnel and materials,and to increase the temporary safety exit,so as to finally solve the contradictions and ensure the safety.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170