检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:施龙青 史雅迪 李越 Shi Longqing;Shi Yadi;Li Yue(School of Earth Sciences and Engineering,Shandong University of Science and Technology,Shandong Qingdao 266590)
机构地区:[1]山东科技大学地球科学与工程学院,山东青岛266590
出 处:《山东煤炭科技》2020年第10期176-178,181,184,共5页Shandong Coal Science and Technology
基 金:泰山学者建设工程专项经费资助。
摘 要:为了解决煤层开采工作面顶板初始最大突水量预计问题,建立了采场顶板初始最大突水量计算的理想化管道突水模型。基于实用矿山压力控制理论,推导出采场顶板初始最大突水量与工作面跨度、老顶岩梁断裂步距之间的非线性关系,揭示了矿山压力对采场顶板最大初始涌水量的非线性正相关效应。In order to solve the problem of the prediction of the initial maximum water inrush from the roof of the coal seam mining face,an idealized pipe water inrush model for the calculation of the initial maximum water inrush from the roof of the stope is established.Based on the practical mine pressure control theory,the nonlinear relationship between the initial maximum water inrush from the roof of the stope and the span of the working face and the fracture step of the old roof beam is deduced,and the non-linear positive correlation effect of mine pressure on the maximum initial water inflow of stope roof is revealed.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.116