检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余健[1] 白威 刘蕊[1] YU Jian;BAI Wei;LIU Rui(Powerchina Beijing Engineering Co., Ltd., Beijing 100024, China;Hohhot Pumped Storage Power Generation Co., Ltd., Hohhot 010051, China)
机构地区:[1]中国电建集团北京勘测设计研究院有限公司,北京100024 [2]内蒙古呼和浩特抽水蓄能发电有限责任公司,内蒙古呼和浩特010051
出 处:《水电与新能源》2020年第10期39-42,共4页Hydropower and New Energy
摘 要:根据我国抽水蓄能电站的电价模式,分析内蒙古呼和浩特抽水蓄能电站电价机制的探索与形成,由于抽水蓄能电站经济和技术上的特殊性,结合我国电力体制改革的总体部署,按照循序渐进,分步实施的原则,最终确定了呼蓄电站采用两部制电价机制。The current electricity pricing modes in China is summarized.Then,the electricity pricing mechanism in Hohhot Pumped Storage Power Station is introduced.Considering the economic and technical particularity of pumped storage power stations,and following the overall arrangement of China’s electric power system reform,the two-part tariff mechanism is adopted in Hohhot Pumped Storage Power Station with the principle of gradual and step-by-step implementation.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229