设计单位牵头的总承包项目风险及化解措施  被引量:2

Risk of the general contracting project led by the design unit and solutions thereof

在线阅读下载全文

作  者:温贵明[1] 刘伟丽[1] WEN Guiming;LIU Weili(Zhongshui North Survey Design Research Co.,Ltd.,Tianjin 300222,China)

机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222

出  处:《水利建设与管理》2020年第10期28-31,共4页Water Conservancy Construction and Management

摘  要:工程建设风险不可避免,如何减小己方风险至关重要。设计单位牵头实施总承包项目,如何增强风险意识,规避或减小风险,是摆在面前的难题。本文从总承包项目管理经验出发,分析其中设计单位可能面临的风险,总结化解风险的经验和做法,可为相关类似项目提供借鉴。Project construction risk is inevitable.Risk reduction is an important problem.Design units take the lead in the implementation of general contracting projects.It is difficult to enhance risk awareness,and avoid or reduce risks.The paper starts with general contracting project management experience.The risks of the design units are analyzed,the experience and practice of risk solution are summarized,thereby providing reference for related similar projects.

关 键 词:设计单位 总承包项目 风险分析 化解措施 

分 类 号:TV512[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象