大跨度连续梁挂篮悬臂浇筑冬季施工技术  被引量:3

Construction technology in winter of hanging basket cantilever pouring of long span continuous beam

在线阅读下载全文

作  者:杨婷[1] YANG Ting(Sinohydro Bureau.8 Co.,Ltd.,Changsha 410007,Hunan,China)

机构地区:[1]中国水利水电第八工程局有限公司,湖南长沙410007

出  处:《资源信息与工程》2020年第5期100-102,106,共4页Resource Information and Engineering

摘  要:为确保魏家湾跨同三高速公路特大桥冬季施工顺利进行,介绍了一种聚氨酯泡沫保温加蒸汽暖棚的冬季施工技术与措施,通过实施获得了良好的保温效果,保障了大跨度连续梁冬季悬臂施工质量,可为今后类似施工提供借鉴。In order to ensure the smooth construction of Weijiawan Bridge crossing Tongjiang-Sanya conventional expressway in winter,a winter construction technology combined with polyurethane foam insulation and steam heating and its measures were introduced.Good heat insulation was achieved by using the measures,and the quality of cantilever construction of large-span continuous beam in winter was guaranteed,which provided reference for similar construction in the future.

关 键 词:连续梁挂篮悬臂浇筑 冬季施工 聚氨酯硬泡 电热炉 保温暖棚 

分 类 号:U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象