检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张腾宵 颜凡新 ZHANG Tengxiao;YAN Fanxin(SINOHYDRO BUREAU 14 CO.,LTD,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《广东水利水电》2020年第10期88-93,共6页Guangdong Water Resources and Hydropower
摘 要:地下水封洞库工程具有地下洞室密集、施工期集中、人员设备多、施工工序交接频繁、相互干扰大等特点,为了随时掌握作业面的施工情况、人员设备动态,实现施工过程的信息化管理,为安全文明施工提供依据,在地下水封洞库中引入安全监控定位系统,采用信息化技术实时、动态地记录洞内情况,为施工管理和应急救援提供有力支持。The underground water sealed cavern project has the characteristics of dense underground caverns,centralized construction period,many personnel and equipment,frequent handover of construction procedures,and large mutual interference.In order to grasp the construction situation of the working face and the dynamic situation of personnel and equipment at any time,realize the information management of the construction process,and provide the basis for safe and civilized construction,the safety monitoring positioning system is introduced into the underground water sealed cavern,and the information system is adopted Information technology can record the situation in the tunnel in real time and dynamically,and provide strong support for construction management and emergency rescue.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49