检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王枢 杨丹萍 WANG Shu;YANG Danping(Shenneng(Heyuan)Power Co.,Ltd,Heyuan 517000,China)
机构地区:[1]深能(河源)电力有限公司,广东河源517000
出 处:《中国高新科技》2020年第18期129-129,132,共2页
摘 要:在燃煤发电机组的研发过程中,1000MW机组二次再热是其中的关键技术。基于二次再热机组降压吹管的复杂系统,提出吹管优化的方案,即在相关的系统设计时,将一次再热器系统与过热器系统设定为一体,把临吹门设置在一次再热器出口,可以把吹管时锅炉的蓄热容量大幅度提升上来,从而有效地提高吹管的质量和效率。In the research and development of coal-ired generating units,the secondary reheat of 1000MW units is the key technology.Based on the complex system of depressurized pipe blowing of secondary reheat unit,the optimization scheme of pipe blowing is proposed.In the relevant system design,the primary reheater system and superheater system are set as a whole,and the temporary blowing valve is set at the outlet of the primary reheater,which can greatly improve the heat storage capacity of the boiler during pipe blowing,so as to effectively improve the quality and eficiency of pipe blowing.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222