作 者:徐庆 杨晓箐 XU Qing;YANG Xiaoqing(Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou 450003,China)
机构地区:[1]黄河勘测规划设计研究院有限公司,河南郑州450003
出 处:《人民黄河》2020年第11期100-102,共3页Yellow River
摘 要:根据CCS水电站TBM步进洞明拱段的地形条件、地质条件、结构受力情况等,按照结构力学法结合美国结构设计相关规范,在不同的荷载组合及不同的受力条件下对结构进行内力计算,得出结构不利的剪力和弯矩,进而对衬砌结构进行了配筋验算。该计算分析结果已在工程中得到应用,可为类似工程衬砌结构设计提供参考和借鉴。According to the topographical conditions,geological conditions and structural stress conditions of the open arch section of the TBM stepping tunnel of CCS Hydropower Station and according to the method of structural mechanics combined with the relevant American struc⁃tural design codes,the internal forces of the structure under different load combinations and different stress conditions were calculated,the unfavorable shear force and bending moment of the structure were obtained and then the reinforcement checking calculation of the lining struc⁃ture was carried out.The calculation and analysis results had been listed in this paper.The application in the project can provide reference for the design of lining structure in similar projects.
关 键 词:TBM 明拱 钢筋混凝土 内力计算 配筋 CCS水电站
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222