检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘学鸽 屈伟强 张延智[1] 贾春雷[1] 赵伟[1] 刘成东 谭小刚[1] 刘博 LIU Xuege;QV Weiqiang;ZHANG Yanzhi;JIA Chunlei;ZHAO Wei;LIU Chengdong;TAN Xiaogang;LIU Bo(Yellow River Water Conservancy and Hydropower Development Corporation,Jiyuan 454681,China)
机构地区:[1]黄河水利水电开发总公司,河南济源454681
出 处:《电工技术》2020年第20期16-17,21,共3页Electric Engineering
摘 要:西霞院电站4台机组共用一套备用水源系统,机组技术供水系统使用备用水源供水方式时,主要依靠3台备用水源泵提供动力水源,采用变频器控制方式有效避免各台机组供水量和供水压力不均衡问题,并且节约大量厂用电,有利于技术供水系统的安全稳定运行。Four units of Xixiayuan power station share a set of standby water source system.When the technical water supply system of the unit uses the standby water source water supply mode,it mainly relies on three standby water source pumps to provide the power water source.Adopting the frequency converter control mode can effectively avoid the imbalance of water supply quantity and water supply pressure of each unit,and save a lot of plant power,which is conducive to the safety of the technical water supply system Stable operation.
分 类 号:TM612[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222