检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗德武 Luo Dewu(China Power Construction Group Guiyang Survey Design and Research Institute Co.,Ltd.,Guiyang 550081,Guizhou)
机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳550081
出 处:《陕西水利》2020年第11期143-145,共3页Shaanxi Water Resources
摘 要:洪家渡水电站库区水位变幅高、河道跨度大,增设拦漂排应结合选址、施工、投资、拦漂效果等因素综合考虑,通过对拦漂排布置型式进行方案论证和对比,确定了两端锚固型式为较优方案。基于对拦漂排各工况的运行条件和荷载组合分析计算,并对拦漂排结构型式进行优化设计。采用张拉绳作为主要受力部件,钢浮箱挂设于张拉绳上,在保证拦漂效果的同时,工程投资更省,施工更便利。对其他水位变幅大、河道较宽的水利水电工程具有借鉴意义。The reservoir area of Hongjiadu Hydropower Station has high water level variation and large river span.The addition of drifting rafts should be comprehensively considered in consideration of factors such as site selection,construction,investment,and drifting effects.Through the demonstration and comparison of the arrangement of drifting rafts,the anchor type at both ends is determined to be the better solution.Based on the analysis and calculation of the operating conditions and load combinations of each working condition of the drifting row,the structure of the drifting row is optimized.The tension rope is used as the main stress component,and the steel pontoon is hung on the tension rope.While ensuring the effect of blocking floats,the project investment is less and the construction is more convenient.It has reference significance for other water conservancy and hydropower projects with large water level changes and wide river channels.
分 类 号:TV732.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.230.250