基于能量法的植被混凝土路堑边坡泥沙冲刷量计算模型优化研究  被引量:3

Research on Optimization of Calculation Model for Sediment Erosion of Vegetation Concrete Cutting Slope Based on Energy Method

在线阅读下载全文

作  者:李灿 周海清 肖前 彭岳 潘惟寅 LI Can;ZHOU Haiqing;XIAO Qian;PENG Yue;PAN Weiyin(China Aerodynamics Research and Development Center,Mianyang 621000,China;Chongqing Key Laboratory of Geomechanics&Geoenvironment Protection(Army Logistics University),Chongqing 401311,China;Chongqing University of Science and Technology,Chongqing 401331,China;China Construction Tunnel Co.,Ltd.,Chongqing 401147,China)

机构地区:[1]中国空气动力与研究发展中心,四川绵阳621000 [2]岩土力学与地质环境保护重庆市重点实验室(陆军勤务学院),重庆401331 [3]重庆科技学院,重庆401331 [4]中建隧道建设有限公司,重庆401147

出  处:《重庆理工大学学报(自然科学)》2020年第10期195-201,共7页Journal of Chongqing University of Technology:Natural Science

基  金:重庆市基础研究与前沿探索项目(CSTC2018JCYJAX0373);重庆市教育委员会科学技术研究项目(KJQN201912902);中建股份科技研发项目(CSCEC-2017-Z-24)。

摘  要:根据植被混凝土坡面冲刷特性,优化设计了能量法计算模型,使其能应用于植被混凝土路堑边坡施工初期的坡面泥沙冲刷量计算。结合室内边坡冲刷试验,设计1∶0.75、1∶1和1∶1.25等3种坡率,在2.5mm/min的降雨强度下进行冲刷试验,通过实测数据和原始模型计算结果对优化模型的合理性进行了验证,同时分析了泥沙冲刷量与降雨历时的关系。研究结果表明:泥沙冲刷量与降雨历时呈对数增加关系;优化模型降雨前期泥沙冲刷量增加迅速,后期增加趋势逐渐稳定,符合真实的植被混凝土边坡冲刷特性;优化模型在降雨前期与试验实测值匹配较好,历时20~50min时相对误差较小,均在15%以内,模型能很好地匹配植被混凝土边坡泥沙冲刷量的计算。According to the erosion characteristics of vegetation concrete slope,the energy method calculation model was optimized and designed,so that it can be applied to the calculation of slope erosion amount in the initial stage of vegetation concrete cutting slope construction.Combined with the indoor model slope scouring test,the slope rates of 1∶0.75,1∶1,and 1∶1.25 were designed and the scouring test was carried out at a rainfall intensity of 2.5 mm/min.The rationality of the optimized model was verified by the measured data and the calculation results of the original model.At the same time,the relationship between the amount of sediment erosion and rainfall duration was analyzed.The results of the study show that:the amount of sediment erosion and the rainfall duration show a logarithmic increase;the optimized model has a rapid increase in the amount of sediment erosion in the early stage of rainfall,and gradually increases in the later period,which is in consistent with the true vegetation concrete slope erosion characteristics;the optimized model matched well with the experimental measured value in the early period of rainfall,and the relative error was relatively small at 20~50 minutes,all within 15%andthe model can well match the calculation of the vegetation concrete slope sediment erosion.

关 键 词:植被混凝土 坡面冲刷 能量法 模型试验 优化 

分 类 号:TU42[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象