检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:翟洁 张毅 张湲 ZHAI Jie;ZHANG Yi;ZHANG Yuan(Beijing Shisanling Pumped Storage Power Station,State Grid Xinyuan Co.Ltd.,Beijing 102200,China)
机构地区:[1]国网新源控股有限公司北京十三陵蓄能电厂,北京市102200
出 处:《水电与抽水蓄能》2020年第5期110-115,共6页Hydropower and Pumped Storage
摘 要:十三陵抽水蓄能电站高水头、大PD值地下埋藏式压力钢管已运行二十多年,且运行环境复杂,充排水风险较大。本文对2017、2018年压力钢管充排水开展分析,通过复核放空工况相关参数,分析压力钢管运行期和充排水期间结构应力和外水压力等监测数据,综合评判结果显示压力钢管结构运行状况良好。The high head and underground buried penstock with large PD value of Shisanling Pumped Storage Power Station has been operating for more than twenty years.And the operating environment is complex.The risk of filling and drainage is large.The filling and drainage analysis of penstock for 2017 and 2018 is carried out in this paper.The relevant parameters are reviewed of the emptying condition.Structural stress and external water pressure of penstock are analyzed in operation period and filling and drainage period.The comprehensive evaluation results show that the structure of penstock runs well.
关 键 词:高水头 地下埋藏式 压力钢管 充排水 监测 结构状况
分 类 号:TV48[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49